Home >> News >> Technical Support
In order to ensure that the multi-disc screw press dehydrator can run continuously at high speed, high efficiency, high quality and low cost, and extend the service life of the main body and supporting facilities, relevant personnel should do a good job in daily inspection, maintenance of the multi-disc screw press dehydrator, so as to meet the requirements of fine management.
1. Equipment Inspection
Equipment inspection is an effective means to grasp the technical status of the equipment in time and implement equipment condition monitoring and maintenance. It is an important work to find and eliminate the hidden danger of the equipment in time through inspection and prevent the sudden failure and accident, so as to ensure the normal operation of the equipment.
1.1 Daily Inspection
Daily inspection is that the operators should check the technical status of all parts of the equipment according to the specified standards, so as to discover the hidden dangers in time and take countermeasures.
1.2 Key Inspection
The operator should check and record each shift or a certain time item by item according to the equipment spot check card. During patrol inspection, the maintenance personnel shall timely and effectively eliminate the abnormalities recorded in the spot check card.
1.3 Regular Inspection
According to the specified inspection period, the maintenance workers should implement a comprehensive inspection and measurement of the equipment performance. In addition to debugging and solving the problems found at that time, the inspection results should be carefully recorded as the basis for decision-making of the equipment maintenance plan.
2. Daily Inspection and Maintenance Items of Multi-disc Screw Press Dehydrator
During daily inspection and maintenance of multi-disc screw press dehydrator, it should be checked according to the requirements of cleaning, tidiness, lubrication, fastening, adjustment, corrosion prevention and safety.
(1) Standardization is to unify the maintenance contents, such as which parts should be cleaned, which parts should be adjusted, which device should be inspected, which process procedures should be formulated and maintained according to the procedures.
(2) Industrialization is based on the application of multi-disc screw press dehydrator in different processes, making various maintenance process regulations for maintenance.
(3) Institutionalization is to stipulate different maintenance cycle and time according to different working condition of multi-disc screw press dehydrator, and strictly implement.
In addition, it is necessary to combine the fine management system and adopt the economic contract responsibility system for the relevant technical personnel.
Installation Viedo of Submersible Mixer
Common Problems of Activated Sludge Process
How to Prolong the Operating Time of Horizontal Decanter Centrifuge
Corrosion In Centrifuge Application
Contact: Bryan Wu
Phone: +86-15995396766
Tel: +86-15995396766
Email: m15995396766@gmail.com
Add: NO.198 JUNMA ROAD, QITING STREET, YIXING, JIANGSU, CHINA.